Construction of the school in Köchü village began in December 2025. According to the Ministry of Construction, Architecture and Housing and Communal Services, the walls of the two-story building have already been erected, and specialists are preparing to install the roof.

Facility parameters and equipment

According to the architectural design, the building will consist of two blocks. The total area of the facility will be 2,703 square meters. The school plans to create all conditions for high-quality learning by providing specialized rooms.

  • classrooms for core subjects
  • computer class and laboratory
  • medical office
  • library
  • canteen
  • vocational training rooms for boys and girls
  • assembly hall

School characteristics

275student seats
218 millionsom cost
2,703sq. m area

The Department of Housing and Communal Construction oversees the quality control of construction and installation works at every stage.