The issue of replacing dilapidated equipment in Toktogul district was raised during a plenary session of parliament. According to Deputy Bolotbek Borbiev, the poor condition of the poles in Imanaliev aiyl aimak causes electricity disruptions during weather fluctuations.

"As soon as the wind picks up, the power constantly goes out"
Bolotbek Borbiev

Infrastructure and Land Issues

In addition to the energy problem, the deputy addressed road construction and land rights registration. Specifically, it was noted that part of the Uch-Terek — Buurakan — Ichke-Sai — Ozgorush ring road has already been paved, but a significant section still requires work.

Key Indicators

850electricity poles requiring replacement
5km of roads paved
12.5km of roads needing paving
2.3 thousandcitizens awaiting land documents

The issue with ownership documents affects people who received sheds or land shares as far back as the 1990s. According to the Land Resources Agency, a corresponding bill is currently being developed to resolve this matter.

Context

Bolotbek Borbiev is a deputy of the Jogorku Kenesh VIII convocation from the 14th district and is a member of the "Ala-Too" deputy group.