The works include graveling and grading of roads. The total length of the sections planned for renewal will be approximately 6.6 km.
Repair parameters
List of streets where surfaces will be updated
- Altyn-Tutun St., from Chortekova St. to Archa-Beshik St. (400 m)
- Altyn-Tutun St., from Ak-Tan St. to Chortekova St. (245 m)
- Kambar-Ata St., from Chortekova St. to Archa-Beshik St. (150 m)
- Abdurakhmanov St., from Sheraliev St. to Sadyrbaev St. (570 m)
- Sheraliev Lane (115 m)
- Min-Kush St., from Sadyrbaev St. to Kara-Kuzhur St. (550 m)
- Matisakov St., from Sadyrbaev St. to Masyraliyev St. (590 m)
- Sadygaly St., from Sadyrbaev St. to Archa-Beshik, 3 (540 m)
- Abdurakhmanov St., 2 (100 m)
- Kara-Kuzhur St., from Kyzyl-Adyr St. to A. Masaliev St. (600 m)
- Kara-Kuzhur St., from Archa-Beshik St. to A. Masaliev St. (520 m)
- Kyzyl-Adyr St., from Absamat Masaliev St. to Sheraliev St. (640 m)
- Abdurakhmanov St., from Sheraliev St. to A. Masaliev St. (580 m)
- 16th St., from Abdurakhmanov St. to Zhany-Turmush St. (610 m)
- Ken-Suu St., from Chortekova St. to Archa-Beshik St. (370 m)
Timeline and oversight
Applications from potential contractors will be accepted until November 25. The quality of the work will be monitored by MTU No. 104 specialists and the technical supervision of the Bishkek Leninskiy District Administration. According to the tender terms, payment for completed tasks will be made by December 4 after their acceptance.












