According to the Ministry of Construction, Architecture and Housing and Communal Services, sanctions were applied following an inspection of several of the company's multi-story sites. The control measures were conducted by the Jalal-Abad regional office of the State Architectural and Construction Control Department.
Sites and scale of violations
During the inspection, specialists checked four construction sites belonging to Dastan Grand House LLC. The main claims concerned violations of construction norms, as well as occupational health and safety requirements at the sites.
Inspection results
All identified violations have been recorded, and the company has been issued orders for their mandatory rectification. The inspections covered the following addresses in Manas:
- 135 Z. Jamashev Street — 12-story building (9 blocks);
- 3A Yu. Abdrakhmanov Street — 15-story building (27 blocks);
- 179 Barpy Seyil Street — 9-story building (5 blocks);
- 7/1 Yu. Abdrakhmanov Street — 12-story building (11 blocks);
Context
The inspection was conducted by the Jalal-Abad regional office of the Ministry of Construction Department. The violations affected multi-story residential construction in the city of Manas.












