Mechanical cleaning of the ravine bed in the village of Ak-Chiy in the Kar-Burgo aiyl aimak of the Ak-Talaa district of the Naryn region was carried out to improve the overall safety of the area. According to the report, the work was aimed at ensuring the free passage of mudflows from the upper part of the village.

Purpose and results of the ravine cleaning work

According to Kylychbek Suranbayev, head of the Ak-Talaa district emergency situations department, removing sediments from the ravine bed is critically important for preventing flooding. As part of the work, a stretch of 350 meters was cleared.

During the work, soil, sand, gravel and other debris that had previously obstructed the normal flow of water were removed using special equipment. This will ensure the free flow of water during rains and mudflows, reducing the risk to nearby homes.

Importance of the measures for the population

This work is aimed at ensuring the free passage of water during rains and mudflows, as well as preventing the risk of flooding of nearby homes
Kylychbek Suranbayev

These measures are intended to improve safety in the territory of the aiyl aimak and minimize the consequences of flood events for the residents of Ak-Chiy.