The branch of the National Electric Grid of Kyrgyzstan OJSC — Jalal-Abad Electric Grid Enterprise confirmed the readiness of the electric grids of Mailuu-Suu district for the autumn-winter period 2026–2027. The total length of the grids serving the district is 188 kilometers.

Grid facilities and consumers

8,104total number of subscribers
7,425household subscribers
679non-household consumers

Electricity service is provided through 109 transformer substations (TS/CTS). Of these, 68 substations are on the balance sheet of the RES itself, and the remaining 41 are on the balance sheet of consumers.

Composition and length of power transmission lines

  • Total length of the grids: 188 kilometers
  • Overhead power transmission lines with a voltage of 6 kV: 60 kilometers
  • Lines with a voltage of 0.4 kV: 128 kilometers
  • 913 poles have been installed on 6 kV overhead power transmission lines
  • Among the poles: 515 reinforced concrete, 263 wooden and 139 metal

In addition, it is noted that the most remote sections served by the RES are located at a distance of about 10 kilometers.