The project envisages significant engineering structures, including "trumpet" and "cloverleaf" interchanges, as well as nine overpasses. A special place in the infrastructure will be occupied by a 507-meter bridge to be built over the Ak-Buura River.

507meter bridge over the Ak-Buura
9overpasses
200+facilities built (including M-11, M-12 and TsKAD)

According to the information, the large-scale construction will be carried out by Avtoban, one of Russia's largest road construction holdings.