Construction of a new wastewater treatment plant in Naryn, equipped with a three-stage treatment system, has now reached 30% completion. The information came from the Naryn city hall.
Technical specifications and stages of work
The new facility is designed to serve a population of 20,000 people. The wastewater treatment process will take place in three stages: mechanical, biological and chemical treatment.
Expanding infrastructure for city residents
The project also provides for the expansion of sewerage networks. Residents of the eastern and western parts of Naryn can already connect to the built networks. In addition, sewage pumping stations have been built in two districts of the city.
Background
The facility is being built as part of the second phase of the project "Rehabilitation of the Water Supply and Sewerage Systems of the City of Naryn." Naryn Mayor Zhyldyzbek Bekkeldiev, Ambassador of the Swiss Confederation to the Kyrgyz Republic Siroko Messerli and European Bank for Reconstruction and Development (EBRD) Regional Director Nodira Mansurova took part in a presentation on the progress of construction.





















